首页/产品中心/Vacuum filling and nitrogen pressure holding testing machine

Vacuum filling and nitrogen pressure holding testing machine

产品优势

Vacuum Pre-Treatment

Vacuum evacuation prior to testing removes residual air, ensuring consistent nitrogen filling.

High-Precision Pressure Hold

Closed-loop pressure control with real-time pressure-time curves enables slow leak identification.

Multiple Operating Modes

Supports single leak test, cyclic pressure fatigue, and long-term static aging.

Multi-Station Parallel Testing

Standard dual-station configuration, expandable to 4/6/8 independently operating stations.

Full Traceability

Auto-generates PDF/Excel reports with barcode binding and MES network integration.

Safety Pressure Relief

Automatic pressure relief upon overpressure, emergency stop, overload and insufficient air supply protection.

获取产品手册

技术参数

Equipment NameVacuum Evacuation, Nitrogen Charging & Pressure Hold Tester
Applicable WorkpiecesCPU/GPU Server Liquid Cold Plates, Energy Storage Water Cooling Modules, High-Pressure Sealed Chamber Components
Standard Station Count24 Stations (Customizable 2/6/8 Parallel Stations)
Test MediumNitrogen / Clean Dry Compressed Air
Power SupplyAC380V±10% 50Hz, Total Power ≤3 kW
Gas Supply Conditions0.6~1.0 MPa Stable Upstream Nitrogen Source
Operating Environment5~40℃ Standard Workshop Conditions
Rated Pressure Range0~3 MPa Closed-Loop Continuously Adjustable
Pressure Control Accuracy±0.1% F.S (Customizable to ±0.05% F.S)
Programmable Pressure Hold Duration10 s ~ 48 h Fully Customizable
System Leakage0.9 MPa Pressure Hold for 30 min, Pressure Drop ≤0.4%
Determination MethodFixed-Duration Pressure Hold, Comparing Start-End Pressure Drop + Real-Time Leak Rate for Comprehensive Pass/Fail Judgment
Operating ModesSingle Leak Test, Cyclic Pressure Fatigue, Long-Term Static Aging Test
Main Control ArchitectureIndustrial Host PC + Dedicated Test Software
Recipe ManagementOne-Click Storage & Switching of Multi-Model Process Parameters
Process VisualizationFull-Process Real-Time Pressure-Time Curve Recording
Alarm MechanismAudio-Visual Alarm for Overpressure, Excessive Leakage, Insufficient Gas Supply + NG Latch
Data TraceabilityPermanent Data Storage, Auto-Generate PDF/Excel Test Reports
ExpandabilityBarcode Traceability, Factory MES Integration
Piping Material316 Stainless Steel + High-Pressure Compression Fittings
Safety ProtectionAutomatic Overpressure Relief, Emergency Stop, Overload Protection
Continuous OperationSupports 7×24 h Uninterrupted Mass Production
Ultimate No-Load Vacuum≤ -0.098 MPa (Absolute Pressure ≈ 2 kPa)
DimensionsL×W×H: 1700×1600×1900 mm

* 以上参数为标准机型配置,其他特殊需求可定制。

适用产品

暂无图片
Server Liquid Cold Plates
暂无图片
Energy Storage Water Cooling Modules
暂无图片
High-Pressure Sealed Chambers
暂无图片
Liquid Cooling Line Assemblies
暂无图片
Valve Bodies & Manifolds

测试流程

Barcode Scan & Record Creation
Workpiece Connection
Vacuum Evacuation
Nitrogen Charging & Pressurization
Pressure Stabilization
Pressure Hold Monitoring
Leak Determination
Depressurization & Report

上位机界面 / 数据追溯

Software Interface

Multi-Model Parameter Recipe Storage with One-Click Recall

Real-Time Display of Pressure, Flow, Temperature, Vacuum Level & Time Curves

Automatic Pass/Fail Determination with NG Latch

Barcode Binding, Historical Query & Access Control

Auto-Generate PDF, Excel or CSV Reports

Supports MES, ERP & Customer Database Interfaces

可选配置

4/6/8 Parallel Stations

Automatic Booster Station

Nitrogen Recovery

Cyclic Pressure Test Program

Temperature Compensation Algorithm

Automatic Loading/Unloading Interface

获取专属测试解决方案

专业团队为您提供选型建议与方案定制

免费方案设计
快速响应报价
现场打样测试支持
立即咨询